How long should concrete dry before drilling?

Answer The amount of drying time before drilling depends on what you plan to do. If you are drilling to add a small attachment, then allow for three to five days. For larger projects, or to attach large f... Read More »

Top Q&A For: How long should concrete dry before drilling

How long should concrete cure before caulking?

The length of time concrete should cure before applying caulk to depends on usage. For smaller areas, let concrete cure 24 to 48 hours, then apply caulk. Larger surfaces, such as driveways may need... Read More »

How long should you wait before stamping concrete?

Do not wait a specific amount of time before stamping concrete, since the weight time depends entirely on the type of concrete and the weather conditions. Instead, watch the concrete, and begin sta... Read More »

How long should concrete dry before fitting a laminate floor?

Concrete has a long drying process. If you are putting a floor over the concrete, you should wait at least two weeks for the concrete to cure. This may take longer if you have had a lot of rain or ... Read More »

How long should a new concrete driveway cure before you can drive on it?

According to the Portland Cement Association, a new concrete driveway should be cured for five to seven days from concrete placement. This crucial step significantly decreases concrete cracking and... Read More »